About Quick View in the IUIE
On this page:
Overview
The IUIE allows you to display the last output generated from any selected scheduled report. Under the tab, you can place a link to the most recent report for a scheduled job. Rather than having to navigate through My Catalog and Completed Reports, you can directly access scheduled reports through .
tab inGeneral layout
- Clicking displays report links on the subtab bar in alphabetical order by report title.
- Each link represents the most recent output from a scheduled job.
- Report output is displayed in the content area under the links.
- Each report display has a link to make it the default report. If this link has been used, the associated report appears in the content area whenever the tab is clicked.
- If no report has been selected as the default, the first report is displayed.
Operation
To add an output link to
:- Access a report object, and set the desired parameter values. Click , and then click . Alternatively, view an existing scheduled job in My Catalog.
- Check .
- Schedule the job for the appropriate time.
To remove an output link from
:- View an existing scheduled job in My Catalog.
- Either uncheck , or check .
To set the default output display:
- Click the link that is to be displayed by default.
- Click link.
This is document avre in the Knowledge Base.
Last modified on 2021-09-20 15:10:29.